Quote Originally Posted by Alien DNA View Post
Sounds good Taily...any pics?
Still doing drawings and a lot of holding front aprons up in position etc at the moment looking at how much of the door sheet metal I'll need to use to graft it all together. Don't think it will be anywhere near as flash as your one with the sectioned roof/pillars though! Thought I'd keep the standard length tub and stand the front wall upright and put a toolbox in front of that, using a small section of bonnet (around 6 inches) out to the apron, which (in the latest idea I have) will have the lights removed, plated then lights painted in place so as to avoid silly questions from the Plod etc....

Small other problem is too many other little jobs on the go at the moment too....

Regards,

Dave.