Thanks for that, much appreciated.
Having never done this stuff before, it will be a learning curve, but that's why I'm doing it, to learn more.
The engine will actually be my last thing on the list to be done.
Having pondered over the van for a while, my first job is to sort the rust.
2nd will be suspension front & rear, steering and brakes.
3rdly will be the engine and transmission.
There will be plenty of things to play with and sort out in between all this though.
The gas is coming out, much prefer straight petrol.
Its a fool proof plan, what could possibly go wrong.....
Bookmarks