Hey to be honest its been a lot longer, actually took it off the road in May. Did quite a few repairs at home before send it off to the fabricator.
Ive done gearbox conversion with a mates help. Still have to put the pedals in, check the clearance of the box and mount the reservoir etc. Heaps to do.
Hope to have it back home by Mid Dec but still a lot of work after that.
Pulled the wiring loom out last night. The old Pink Ignition wire has certainly melted over time. I did the pink/yellow join about 4 years ago but suspect the melting happened prior.
So stripping the loom and running larger pink/yellows.
Essentailly all we have outsourced is the fabrication of the repair section that you cant get, and the paint.
Bookmarks