Hello...posting an update and some pics...
The trimmer man is pushing along with speaker locations/installs, and the floor sound deadening and carpet fitting in the front. The fiberglass roof plug and A pillar trims are now sealed, sanded and primed, and its nearly time to build the roof console and secret feature for the ceiling in the back (ok its a surfboard shape).
Some pics as usual...
image (24).jpg
PXL_20260816_005617299.MP.jpg
PXL_20260816_005804526.MP.jpg
PXL_20260816_011116072.MP.jpg
PXL_20260824_053559574.jpg
image (20).jpg
image (21).jpg
image (22).jpg
image (23).jpg





Reply With Quote
Bookmarks